Abstract
The aeromagnetic survey was carried out by Goldak Airborne Surveys and data were acquired from March 10 to July 6, 2017. Spacing for the nominal traverse and control lines were 400 m and 2400 m, respectively. Nominal terrain clearance was 150 m.
Products
Name
Comment
Download
Geotiffs | The geotiffs include open files 2017-61 and 2017-62 and BC Geoscience Maps 2017-2 and 2017-4. | http://data.geology.gov.yk.ca/Reference/DownloadProduct/50957 |
Grid files | Grid files are for the Llewellyn area. | http://data.geology.gov.yk.ca/Reference/DownloadProduct/50958 |
Map | http://data.geology.gov.yk.ca/Reference/DownloadProduct/50959 | |